Par
Editorial Flers
Published on
September 28, 2024 at 6:10 a.m.
See my news
Follow L’Orne Combattante
1 month. This is the time lost on the Inolya social housing site on rue Saint-Jacques, in Condé-en-Normandie (Calvados). “The ground was too wet due to many bad weather in spring », confides Valérie Desquesne.
A delay which affected the third block of housing where the windows remain to be installed and the facades and roofs to be finalized. In total, 19 houses from T2 to T4must be delivered by the end of December.
Several criteria to respect
“We will now meet with the lessor Inolya for the allocation commission. The files will be pooled before making a choice which will respect several criteria such as accessibility or the size of the household. »
However, the municipality indicates that it no longer receives files. Those interested can always do so through Inolya.
Follow all the news from your favorite cities and media by subscribing to Mon Actu.