Start of queues on the E40
Not much change this morning and a still trouble-free situation on our roads.
Note the start of the queues on the E40 Liège-Brussels between Everberg and Woluwé-Saint-Etienne (+10 min)
Same situation at the end of the E411 Namur-Brussels from Hoeilaart.
The lines that have lengthened at the end of the E429 Tournai-Brussels where you now add 15 minutes towards the ring road from Brussels to Halle.
07h10
No incidents to report on our road network
We notice:
15 minutes of queues on the Brussels outer ring road between Jette and Anderlecht-Nord towards Halle.
10 minutes of queues
–> at the end of the E419 Tournai-Brussels between Tubize and Chaussée de Mons
–> at the end of the E19 Antwerp-Brussels between Puisie and Machelen
–> on the inner ring between Strombeek-Bever and Machelen then between Wezembeek-Oppem and Tervuren towards Waterloo.
06h32
Not much to report on our roads
The start of the usual lines around the construction zones on the Brussels ring road.
Indoors between Strombeek-Bever and Machelen and before the 4 Bras de Tervuren towards Waterloo.
Outdoors between Grand-Bigard and Anderlecht-Nord towards Halle.
05h57
Nothing to report this Wednesday morning
We will remind you of these works which will complicate your traffic on the Nationale 5 and which were put in place yesterday near Gerpinnes. The construction of a new roundabout is being launched at the crossroads formed by the N5 and Rue de Bertransart (at the Car Wash of the Nationale 5).
Long-term works which will complicate the already quite difficult traffic on the Nationale 5 at the arrival or exit of the Bultia roundabout.
You only travel on one lane per direction with a speed limit of 50 km/h.
This is the first phase of the project, which will be in place until next SPRING.
Belgium