As part of the work, Coraly announces several lanes with limited or impossible traffic, from Tuesday May 7 at 10 p.m. to Sunday May 12 at 12 p.m.
Construction site on the A47
In Trier, the construction site between Givors-Ouest and St-Martin-la-Plaine will prevent traffic on one lane out of two of the A47 in the east/west direction due to the installation of equipment.
On the ring roads of the Lyon metropolis
On the northern ring road, in Lyon, between the Nœud du Valvert and the Porte de La Pape in the east/west direction, development work will result in a total closure. Same thing in Villeurbanne between Porte de La Doua and Porte de Croix-Luizet in the west/east direction.
On the ring road, near Bron, between Porte des Essarts and Porte de Croix-Luizet in the south/north direction, development work will result in a total closure of the road. And between Porte de Croix-Luizet and Porte de Cusset in both directions of traffic, traffic will be reduced to one lane in both directions.
Finally, in Vaulx-en-Velin, at the Croix-Luizet node, a total closure of the ring roads towards the A42 has been announced due to work.
#French