New disruptions are expected on the roads of Gard from this Monday, January 20. Update on the different construction sites.
Here's what you need to remember before hitting the road this Monday, January 20.
Via Rhona
Between Aigues-Mortes and Le Grau-du-Roi: from Monday January 20, 7 a.m., and until Thursday January 30, 5 p.m., work on the sanitation network will result in the closure of Via Rhona for the entire the duration of the construction site, evenings and weekends included. A diversion is in place locally.
RD135 in Milhaud
From Monday January 20, 8 a.m. to Saturday January 25, 5 p.m.: maintenance of the turret radar will require a slight encroachment on the roadway, be careful.
RD6086 in Bezouce
From Monday, January 20, 9 a.m., to Friday, January 24, 4:30 p.m.: maintenance of the turret radar will result in alternating traffic between 9 a.m. and 4:30 p.m.
-RD986L at Comps
From Monday January 20, 9 a.m. to Friday February 7, 4:30 p.m.: creation of an electrical network. In this sense, traffic will alternate between 9 a.m. and 4:30 p.m.
RD135 Vauvert – Le Cailar
From Wednesday January 22, 8 p.m. to Thursday January 23, 7 a.m., the level crossing will be closed at the Tourradons bridge, at night, between 8 p.m. and 7 a.m. Follow the local diversion in place.
Please note that the projects already underway are continuing.