A630 – ring road – Municipalities of and Lormont – December 2024 – Press releases 2024 – Press releases – News

A630 – ring road – Municipalities of and Lormont – December 2024 – Press releases 2024 – Press releases – News
A630 – Bordeaux ring road – Municipalities of Bordeaux and Lormont – December 2024 – Press releases 2024 – Press releases – News

Updated on 12/12/2024

The State carries out maintenance and upkeep work on the Aquitaine Bridge and its surroundings, to guarantee the viability of the structure and the safety of the 110,000 users who use it daily.

In order to minimize inconvenience to users, operating measures will be adapted. The work will, however, require in the direction of traffic outside and on the section of the A630 ring road between interchange 2 (Lormont – Rouge) and interchange 4 ( – Labarde):

  • closing of SATURDAY December 14 at 22i am Sunday December 15 has 10h,
  • reduction to one lane of traffic Sunday, December 15 from 10 a.m. to 6 p.m.

Diversions will be put in place by the inner ring road and the outer ring road, via the François Mitterrand bridge as well as by the local network. Users are invited to increase their vigilance and caution by respecting the signs, for their safety and that of those involved.

For any additional information, to prepare their trips and to find out about traffic conditions, users are invited to consult thes sites internet Smart Bison et dira.fr as well as the Twitter account @BordeauxTrafic.


-

-

PREV New Victory For Atlético Madrid, Which Catches The Leader Barcelona
NEXT The decision is made! DFB announces it – DerWesten.de