Eleven new disruptions are planned on the Gard RD network, starting this Monday, October 21, 2024.
RD363 to Aigues-Vives:
From 10/21/24 (08:00) to 10/30/24 (17:00)
Coating repair.
Road closed, between Aigues-Vives and the RN113, during the day, from 8:00 a.m. to 5:00 p.m.
Follow the local diversion.
RD979 to Aimargues:
From 10/21/24 (08:00) to 11/19/24 (20:00)
Work on the level crossing.
Work in different phases:
1 – Road tilting with width limited to 3.5m, between Monday 10/21/24 (8:00 a.m.) and Monday 10/28/24 (8:00 p.m.).
2 – Total closure of the RD979, the night of Monday 10/28/24 to Tuesday 10/29/24, between 8:00 p.m. and 8:00 a.m.
3 – Full reopening on Tuesday 10/29/2024, between 8:00 a.m. and 8:00 p.m.
4 – Total closure of the RD979, the night of Tuesday 10/29/24 to Wednesday 10/30/24, between 8:00 p.m. and 8:00 a.m.
5 – Total reopening from Wednesday 10/30/2024 (8:00 a.m.) to Tuesday 11/19/24 (6:00 a.m.).
6 – Road tilting with width limited to 3.5m, Tuesday 11/19/24, from 6:00 a.m. and 8:00 p.m.
RD18 to Saint-Anastasie:
From 10/21/24 (07:30) to 10/25/24 (18:00)
Road development.
Resurfacing: road closed, follow the local diversion.
RD50 on the Pont des Abarines :
10/21/24 (from 08:00 to 18:00)
Detailed inspection.
Road closed between Mialet and Saint-Jean-du-Gard.
Follow the diversion via Anduze.
RD135 to Rodilhan :
From 10/21/24 (08:00) to 11/08/24 (17:00)
Felling and clearing.
Traffic will only alternate between 9:00 a.m. and 4:30 p.m.
RD260 to Saint-Jean-du-Gard:
From 10/22/24 (07:00) to 10/23/24 (18:00)
Renovation of coating.
Road closed towards Lozère.
Diversion via RD907.
Felling and clearing from 10/21/24 (08:00) to 11/08/24 (17:00).
Traffic will only alternate between 9:00 a.m. and 4:30 p.m.
RD979 in Saint-Anastasie:
From 10/22/24 (09:00) to 10/22/24 (16:30)
Inspection of Pont-Saint-Nicolas
Periodic visit with basket on the Pont-Saint-Nicolas.
ROAD CLOSED.
Diversion via RD22 and RD981.
RD6113 in Bouillargues:
From 10/23/24 (07:30) to 12/13/24 (17:00)
Road repair and creation of a greenway.
Speed will be limited to 50 km/h in the construction site area.
To build the road surface, traffic will be cut off with a diversion in place for 3 nights.
This work will only take place at night, between 9:00 p.m. and 6:00 a.m.
RD3 to Collias:
From 10/23/24 (07:30) to 10/23/24 (18:00)
Work on a structure.
ROAD CLOSED.
Follow the local diversion.
RD442 in Garons:
From 10/24/24 (9:00 p.m.) to 11/01/24 (06:00 a.m.)
Road purges.
Traffic will only alternate at night, between 9:00 p.m. and 6:00 a.m.
Automobile Rally – 65th Critérium Des Cévennes / French Rally Championship:
From 10/24/24 (06:00) to 10/25/24 (20:00)
Numerous traffic disruptions around Pont d’Hérault, Le Vigan, Valleraugue, L’Espérou.
Related News :