production stopped since the explosion

production stopped since the explosion
production stopped since the explosion

A Volvic water bottling factory is not operating this Thursday, May 2, 2024 when employees should have been back on the premises after the non-working day of May 1. The site, located in Puy-de-Dôme, was the victim of a malicious act on the night of Tuesday April 30 to Wednesday May 1, 2024, indicated the Clermont-Ferrand public prosecutor’s office.France Media Agency (AFP). An explosion would have taken place.

According to information from BFMTV And The mountain two people reportedly managed to enter the factory. “Our Volvic production site was the victim of a malicious act”without causing any injuries, confirmed toAFP the management of Volvic (Danone group). She mentioned “significant damage”. A Source close to the case, who speaks of a voluntary act in view of the findings, added that the damage affected a building of 20 m2.

A message on a wall

Consequently, production could not resume this Thursday, May 2, 2024. “The damage is technical and has no impact on water quality”assured Volvic toAFP. According to The mountainthe resumption of activity cannot take place for several days.

An inscription was found on a wall: “Water extractivism? No, but in the water.”, indicated prosecutor Dominique Puechmaille. A complaint has been filed. An investigation was opened and entrusted to the gendarmerie research section. Two suspects were filmed by video surveillance cameras, according to BFMTV.

-

-

PREV Live from SantExpo | The digital hospital of the future is being built today
NEXT Russian ship-to-ship oil operations fall in May as Greece extends naval advisory